Extension Beginner’s Guide

Best Brothers Group of Companies - Automatic doors specialist > Renovation > Renovation Guide > Extension Beginner’s Guide

Extending is a popular way to add space without having to move. We explain everything you need to know from planning permission to costs, design work and much more

Extension Beginner’s Guide

It is said that for every person who self builds there are 15 that add extensions to their homes. The reasons for all this are easy to see. It often makes more economic sense to stay put and avoids the need to find a plot. It means we can stay in the same neighbourhood if we like it and that the children can remain at the same school.

This article covers common questions about extensions, such as:

Why Should You Extend Your Home?

An overwhelming advantage of extending and not moving is the issue of stamp duty. It does not take a genius to work out that by the time you have calculated the agents fees for selling your house and the stamp duty on the one you are thinking of buying, you might well find you could build yourself quite a decent extension for the same price.

What do You Need to Consider Before Extending?

The trick is to extend and to come out well in the investment stakes, which means you have to put a lot of thought into even the smallest extension. For example, if you merely wish to extend the kitchen at the rear of your 1930s semi, should it be single storey or two? If it is the latter, what will go above it?

There are also practical issues to consider that are not directly concerned with the construction process. Access is a good example. If you add to your accommodation, will it mean more cars will need to be parked on the drive? If you have no drive then the lack of off-street parking might be a reason for the refusal of planning permission.

Similarly, if your house is in a terrace do you have rear access for the unloading of building materials or if not, will you have to bring everything from beams to blocks, and girders to guttering through the house?

Other important aspects to consider before you get to the stage of getting your plans drawn are matters like:

  • soil conditions on the site;
  • services;
  • surrounding trees;
  • any history of flooding;
  • rights of way.

Another wise move is to get to know someone who has done a similar extension. They might have a builder or particular tradesman to recommend (or not recommend) but either way they will be full of useful tips on how long to allow for different tasks and many other matters.

How Much Does an Extension Cost?

There are many variables that will affect the cost of your extension such as soil type (which impacts the foundations); whether you are building a single or two storey extension; what the extension will be used for; and how much glazing you plan to specify.

Depending where you are in the Canada, for a straightforward extension you should allow around $1500–3000/m². Remember that the standard of specification you choose will have an enormous influence on the build cost. Experienced renovator Michael Holmes, says a single storey extension will cost the following per/m².

  • Basic quality $1500 to $2500
  • Good quality $2000 to $3000
  • Excellent quality $3000 to $4000

A two storey extension will not cost much more per square metre because, aside from the extra interior fixtures and finishes, you are only adding walls and floor joists — a roof and foundations are required whether your extension is single or two storey.

Remember: Balance the amount you are willing to spend on your extension with the estimated value it will add to your home.

How to Finance Your Extension

There are several options when it comes to borrowing money to finance your extension. However prudence is the watchword — if you borrow more than you need you might do unnecessary things in the course of the job and have difficulty paying it all back. So always be conservative.

In an ideal world, we would all finance our projects using our savings, but with recent times having offered poor interest rates, the financial landscape has been one that favours borrowers over savers. If you need to borrow the money, your best options are:

  1. Credit card: If you need to borrow thousands rather than tens of thousands for your work, an interest-free credit card is a good choice. Shop around — the best deals offer up to 27 months of zero-rated spending.
  2. Loan: Personal loans of up to around $40,000 are suited to smaller projects. The loan may be enough to cover the building work and if you are fitting kitchens or bathrooms in your extension you can often buy these on finance from larger stores. Just keep an eye on repayments as they can quickly add up when you borrow from several sources.
  3. Remortgage or secured loan: If you are borrowing more than $35,000 you may need to remortgage your home or take our a secured loan against your home. Many building societies offer what is known as a Home Improvement Loan of up to $300,000.

Payments

Your builder will generally stage payments for each phase of the project. Try not to make any payments upfront. If it is necessary to purchase an expensive item perhaps a bathroom suite some months in advance of its installation, you should make sure it is in your name and not that of the builder, just in case they should go out of business. If necessary you should go to the place where it is stored and make sure the ownership is transferred to yourself.

Your designer will charge fees according to the work involved, so an accurate quotation of the fee would be a very useful thing to have before you give the go-ahead for plans to be prepared.

It is wise to check what any quote includes and who will pay any local authority application fees. Also, ask if any provision has been made should structural calculations be required.

VAT

VAT is zero-rated on new build in domestic properties including self builds, but this does not include extensions.

If you are renovating or extending a property that you can prove has been empty for 2 years or more, it will be treated as a conversion and therefore be charged at the reduced rate of 5%. The VAT concessions are only available via a VAT registered contractor.

Will I Need Planning Permission for my Extension?

Planning consent may or may not be required for your proposed extension. Under the Permitted Development Rights system a large number of home extensions can be built without the requirement of planning permission.

  • You can extend a detached dwelling by 8m to the rear if it’s single storey or 3m if it’s double.
  • There are height restrictions. A single storey extension not being higher than 4m in height to the ridge and the eaves, and ridge heights of any extension not being higher than the existing property.
  • Two storey extensions must not be closer than 7m to the rear boundary.
  • It must be built in the same or similar material to the existing dwelling.
  • Extensions must not go forward of the building line of the original dwelling.
  • Side extensions must be single storey, maximum height of 4m and a width no more than half of the original building.
  • In Designated Areas side extensions require planning permission and all rear extensions must be single storey.
  • An extension must not result in more than half the garden being covered.
  • You can only do it once and the original building is either as it was on 1st July 1948 or when it was built. In Northern Ireland it is as it was built or as it was on 1st October 1973.

You should bear in mind that if your house is in a Conservation Area or a National Park, the amount of work one can do under Permitted Development is usually reduced.

Your local authority has the power to remove Permitted Development Rights if it feels the character of the area wll be threatened by any new work. If in any doubt, you should check with your local authority planning department.

If you are doing an extension that will need planning permission, it is wise to pop into your local planning office to find out informally what might be permitted — especially if you are planning anything out of the ordinary. It is always wise to research the local planning policies so that you will be aware from the start that an uphill struggle awaits you if you plan anything too exotic in the area where your house is situated.

Listed Buildings

All alterations to listed buildings, including internal ones, require consent and it is a criminal offence to alter a listed building without this consent. With a listed building the planners will always regard the existing property as more important than what you are proposing to add to it. Any extension will therefore have to respect the flavour, appearance and historic material used in the construction of the original house.

Depending on the size of the extension you propose, you might need planning permission as well as listed building consent to make your alterations.

Local Authority Grants

Unless your house is in an exceedingly poor state or is listed Grade I or Grade II*, or you are disabled, you are likely to have great difficulty in obtaining a grant for your work. However some organisations will offer help to maintain a period property (usually only to bring it to a basic standard of living to avoid demolition), so enquire with your local authority.


Building Regulations

Regardless of whether your new extension does or does not require planning permission, it will need Building Regulations Approval. Building regulations are rules approved by Parliament laid down to ensure the mimimum design and construction standards are achieved. These cover all manner of subjects such as fire and other forms of safety, insulation, the drainage system, and access.

Building control officers do not supervise work on your behalf. Their role is to ensure the minimum standards of the building regulations have been adhered to.

To meet Building Regulations you either:

  • Send what is called a Full Plan Submission to your local authority. In this case you pay a fee and the building inspector visits the site at the various stages of the build and inspects the work as it proceeds.
  • Submit a Building Notice. This is a statement in which you inform the council that you will be complying with the regulations in building your extension and gives the building control department 48 hours notice of your intention to start the work. Surveyors will come and inspect the work at various stages and will advise you of any problems.

The second method carries an element of risk because you do not have the benefit of an approved plan to work to and the building control surveyor may only know after you have contravened a regulation requirement. It could therefore prove to be an expensive way to build if problems are discovered that have to be rectified.

Warranties

Getting a warranty for your extension is advisable as it will cover you for things such as structural defects or faulty workmanship. Should the worst happen, the builders who did the work will need to return to put right what has gone wrong.


How to Design an Extension

Many people design their own extensions, using structural engineers for advice. Others use a design and build company who can take on the whole project.

The advantage of hiring a professional to do the design work, is that they might be able to visualise the space in a way that you had not thought of due to overfamiliarity with the existing layout of your home. It is also advisable to work with a professional designer with experience in the area if you are extending a listed home or a home in a Designated Area.

However, there is plenty of advice and inspiration for anyone who does want to take on the design work themselves.

Building an Extension

Who Will Manage the Work?

Early on, you will need to decide who will manage the build of your project. If the work is carried out by a design and build company, this will be managed for you, but if you have designed it yourself, or used an architect, you need to find a main contractor to pick it up from here. Alternatively, you might choose to manage the build yourself hiring subcontractors for each stage. Instead, you could hire a project manager to take on this role for you.

Finding a Builder

If there is one thing that is more difficult than finding the right builder, it is getting on with him throughout the project. Time and time again it is the human element that fails. Put simply: can you get on?

Obviously a good recommendation helps, but it is wise to talk to previous clients of the builder. You should also ensure that they have contractors all risks insurance.

If the builder has sufficient information there is no reason why they should not be able to give you a fixed price detailed quotation. Day work rates can be a recipe for disaster for all sorts of reasons. Try to avoid them except for extras requested at your behest although sometimes it is impossible to do so.

If VAT is to be added to the price given, make sure any quotation has a VAT registration number on it and a VAT receipt is provided when payment is to be made. It has been known for some less reputable operators to use the VAT system as a means of adding more onto the bill which they then keep for themselves.

Tradesmen

It is enormously helpful if you manage to find a small group of tradesmen, all of whom have several trades under their wing. This can be crucial in keeping continuity. Time wasted can prove very expensive for a variety of reasons: e.g. scaffold and plant hire, additional labour and rent.

You should also remember that anyone hiring his/her own labour effectively becomes the builder. There is no contract with a main contractor and the buck stops with you. If you take on this role, you will have to manage:

  • trades
  • materials
  • services
  • keeping the site tidy
  • relevant site insurances and public liability insurance.

Tradesmen

It is enormously helpful if you manage to find a small group of tradesmen, all of whom have several trades under their wing. This can be crucial in keeping continuity. Time wasted can prove very expensive for a variety of reasons: e.g. scaffold and plant hire, additional labour and rent.

You should also remember that anyone hiring his/her own labour effectively becomes the builder. There is no contract with a main contractor and the buck stops with you. If you take on this role, you will have to manage:

  • trades
  • materials
  • services
  • keeping the site tidy
  • relevant site insurances and public liability insurance.

Safety and Disruption on Site

The first rule to stay sane is to stay safe, and the way to do this is to have a strict regime with the builders. They will not thank you if you are under their feet all the time, so here are a few suggestions as to how to remain both safe and sane.

Try to keep the mess to a minimum. You can do this by:

  • Using masses of protective plastic sheeting wherever appropriate
  • Sealing off the rooms being worked on.
  • Provide welfare facilities (rest area, toilet and access to a kettle) for your builders.

Should You Move Out While Extending?

If the builders need to have access to every room the best way to preserve your sanity and keep the project on track, is to seal yourselves off as far as possible for a few months. However not all extenders and converters are able to do this and if children are involved it is often best to let discretion take the better part of valour and move out for a few months.

This is particularly so if the extension is in fact a complete remodelling and the builders are working on the whole house. One option used by many is a caravan in the garden. It can be a cheap option and allows you to stay on site.

Renting rooms locally is a costlier alternative but might be necessary if you have children. If you are not too far away you can still keep your finger on the pulse. Going on an extended holiday and leaving the builder unsupervised is not to be recommended.

Always factor the cost of accommodation into your extension budget.